.png)
When a renter's vehicle struck the exterior of this apartment building, the resulting structural and interior damage required a complete remodel from the point of impact inward. Aegis was brought in to assess the full scope, coordinate all trades, and execute a phased restoration that returned the unit to move-in condition — built to last, not just repaired to pass.
.png)
.png)
.png)
Full interior remodel completed from structural framing through finish work. Damage was remediated at every layer — framing, drywall, flooring, trim, and affected systems — with before and after documentation captured throughout. The property was restored to pre-loss condition with no deferred repairs.